New Product Introduction (NPI) Solutions

New Product Introduction (NPI) Solutions

New Product Introduction (NPI) support connects design review, prototyping, process validation, pilot production, quality planning, and production preparation in one structured manufacturing workflow.

Get Started

NPI Planning Benefits

Earlier manufacturability review
Clear prototype and pilot-build objectives
Project-specific inspection planning
Controlled drawing and requirement updates
Preparation for repeat production

Design, Material & Process Review

Engineering review can identify manufacturability risks before production decisions are finalized. Part geometry, material, tolerances, surface finish, quantity, inspection, and intended use are considered together. Prototype routes can include CNC machining, 3D printing, vacuum casting, injection molding, and sheet metal fabrication. The appropriate route is confirmed against the available drawings and project requirements.

Design, Material & Process Review

Prototype & Pilot Build

Physical parts help teams review fit, function, assembly, appearance, and manufacturability before repeat production. A pilot build can be used to confirm the selected process, workholding or tooling approach, inspection points, packaging, and communication workflow. Quantity and timing are reviewed for each project rather than assumed in advance.

Prototype & Pilot Build

Production Preparation

Before production release, the agreed drawing revision, material, tolerances, finishing requirements, inspection scope, quantity, packaging, and delivery plan should be clearly recorded. Changes identified during prototyping or pilot production can then be reviewed before the next build, reducing avoidable ambiguity between design and manufacturing.

Production Preparation

NPI Process

1

Requirements Review

Review the available model, drawing, material, quantity, critical features, finish, inspection needs, and intended use.

2

DFM & Process Planning

Identify manufacturing risks and agree the prototype route, material, tolerances, finishing, and evaluation plan.

3

Prototype & Evaluation

Produce parts for fit, function, assembly, appearance, or other agreed checks, then record required changes.

4

Pilot Build

Use an agreed pilot quantity to review process consistency, inspection points, handling, packaging, and documentation.

5

Production Preparation

Confirm the released revision, production scope, quality plan, schedule, packaging, and delivery requirements.

Our Key NPI Capabilities

Design for Manufacturability (DFM) review based on the available model, drawing, and intended process.

Material and manufacturing-process comparison based on functional and project requirements.

Prototype planning for fit, function, assembly, appearance, or manufacturability evaluation.

CNC machining, 3D printing, vacuum casting, sheet metal, tooling, and injection molding support.

Pilot-build planning with project-specific quantity, inspection points, and acceptance criteria.

Drawing-revision and requirement review before a new build or production release.

Inspection and documentation scope agreed during engineering review.

Packaging, labeling, and delivery requirements reviewed before release.

Information to Start an NPI Review

Complete information is helpful, but early-stage projects can begin with what is currently available. Missing items can be identified during review.

3D model and dimensioned drawing, when available

Part function, assembly context, and intended use

Material grade and acceptable alternatives

Critical tolerances, datums, threads, and fits

Surface finish, color, texture, and masking requirements

Prototype purpose, quantity, inspection needs, and target schedule

Stage-Gate Checks

1

Before prototyping

Confirm the revision, prototype objective, process, material, critical requirements, quantity, and review method.

2

Before a pilot build

Review prototype findings, approved changes, inspection points, acceptance criteria, and pilot quantity.

3

Before production release

Confirm the released files, production scope, quality documentation, packaging, schedule, and delivery requirements.

Materials Selection for NPI

AluminumStainless SteelSteelBrassCopperTitaniumBronzeMagnesium

Our NPI Quality Control

Quality Planning: Drawing requirements, materials, tolerances, finishes, and inspection needs are reviewed before production. Inspection Equipment: Inspection methods and equipment are selected according to drawing requirements, tolerances, part geometry, and the agreed inspection plan. Material Documentation: Available material documentation and project-specific compliance requirements should be confirmed during engineering review before production.

What is NPI in Manufacturing?

New Product Introduction (NPI) is the structured transition from a product design to a repeatable manufacturing plan. It typically includes requirements review, prototyping, engineering evaluation, pilot production, quality planning, and production preparation. Be Honest Precision supports the manufacturing stages of this process; product approval and validation criteria remain specific to each customer and project.