New Product Introduction (NPI) Solutions
New Product Introduction (NPI) support connects design review, prototyping, process validation, pilot production, quality planning, and production preparation in one structured manufacturing workflow.
Get Started
NPI Planning Benefits
Design, Material & Process Review
Design, Material & Process Review
Prototype & Pilot Build
Prototype & Pilot Build
Production Preparation
Production Preparation
NPI Process
Requirements Review
Review the available model, drawing, material, quantity, critical features, finish, inspection needs, and intended use.
DFM & Process Planning
Identify manufacturing risks and agree the prototype route, material, tolerances, finishing, and evaluation plan.
Prototype & Evaluation
Produce parts for fit, function, assembly, appearance, or other agreed checks, then record required changes.
Pilot Build
Use an agreed pilot quantity to review process consistency, inspection points, handling, packaging, and documentation.
Production Preparation
Confirm the released revision, production scope, quality plan, schedule, packaging, and delivery requirements.
Our Key NPI Capabilities
Design for Manufacturability (DFM) review based on the available model, drawing, and intended process.
Material and manufacturing-process comparison based on functional and project requirements.
Prototype planning for fit, function, assembly, appearance, or manufacturability evaluation.
CNC machining, 3D printing, vacuum casting, sheet metal, tooling, and injection molding support.
Pilot-build planning with project-specific quantity, inspection points, and acceptance criteria.
Drawing-revision and requirement review before a new build or production release.
Inspection and documentation scope agreed during engineering review.
Packaging, labeling, and delivery requirements reviewed before release.
Information to Start an NPI Review
Complete information is helpful, but early-stage projects can begin with what is currently available. Missing items can be identified during review.
3D model and dimensioned drawing, when available
Part function, assembly context, and intended use
Material grade and acceptable alternatives
Critical tolerances, datums, threads, and fits
Surface finish, color, texture, and masking requirements
Prototype purpose, quantity, inspection needs, and target schedule
Stage-Gate Checks
Before prototyping
Confirm the revision, prototype objective, process, material, critical requirements, quantity, and review method.
Before a pilot build
Review prototype findings, approved changes, inspection points, acceptance criteria, and pilot quantity.
Before production release
Confirm the released files, production scope, quality documentation, packaging, schedule, and delivery requirements.
Materials Selection for NPI
Our NPI Quality Control
Quality Planning: Drawing requirements, materials, tolerances, finishes, and inspection needs are reviewed before production. Inspection Equipment: Inspection methods and equipment are selected according to drawing requirements, tolerances, part geometry, and the agreed inspection plan. Material Documentation: Available material documentation and project-specific compliance requirements should be confirmed during engineering review before production.
What is NPI in Manufacturing?
New Product Introduction (NPI) is the structured transition from a product design to a repeatable manufacturing plan. It typically includes requirements review, prototyping, engineering evaluation, pilot production, quality planning, and production preparation. Be Honest Precision supports the manufacturing stages of this process; product approval and validation criteria remain specific to each customer and project.